CASE STUDY: Shoreham Power Station – specialised electrical install

Overview

Electrical Installation & Maintenance across the entire site and subsidiary domains. New sub-mains to final circuits, from luminaires to instrumentation covering both building infrastructure and plant generation equipment.

Hazardous Area Environment and ATEX Installations, maintaining specific equipment and replacing as required regarding a number of Gas-present domains associated in the plant.

Upgrade and additions to the site wide Public Address system.

Works involved a new dual-rack amplifier, monitoring software, integrated into the existing Fire Alarm and Tannoy Facility with additional perimeter horns and sounders to areas not covered in the original site layout.

Electrical Periodic Inspections with recommendations to rectify/improve issues to assist their commitment to “total compliance”.

“…we have benefitted greatly from Boxall’s expertise over the last two decades, especially with regards to ATEX. Boxall’s willingness to share with our team has really helped us on a day to day operational basis.”

Neil Boreham, Station Manager – 29 March 2019

 

Location:
Shoreham-on-Sea,

Sector:
Utilities

Status:
Complete